Our buyers guide (available free on www.hartech.org) section 5 now contains more information and photos about, equipment necessary to re-machine Lokasil (pages 16-1, new oil spray jets directed at the bore scoring area (page 54), the problems with iron (or steel) liners (from page 57), some reasons for smoking on initial start-up (page 64) and our new IMS shafts (currently in manufacture) that are fitted with the latest large IMS bearing (generally regarded as permanently solving the weakness) that will be available for all models including the older Roller chain engines (pages 69 to 70).
Baz
Baz